Please enter search query.
Search <book_title>...
Veritas™ 5250 Appliance Hardware Installation Guide
Last Published:
2024-08-21
Product(s):
Appliances (Version Not Specified)
Platform: Veritas 5250
- Hardware overview
- Preinstallation requirements
- S Series Appliance installation procedures
- D Series Appliance installation procedures
- Next steps after installation
- Appendix A. Adding one or more storage shelves to an operating appliance that does not have any storage shelves
- Connecting the S Series storage shelves to the appliance
- Connecting the D Series storage shelves to the appliance
- Appendix B. Adding storage shelves to an operating appliance that has at least one storage shelf attached
- Recabling to connect additional S Series storage shelves
- Recabling to connect additional D Series storage shelves
- Appendix C. Configuring the disk space for new NetBackup Expansion Storage Shelves
- Appendix D. Configuring the disk space for new Flex Expansion Storage Shelves
Installing the appliance into a rack
After the storage shelves and the appliance rails have been installed, you can install the appliance into the rack.
To install the appliance into the rack
- Verify that the outer rail is securely attached to the rack. Pull the intermediate rail forward. Ensure that the ball bearing retainer is locked forward.
- Verify that the inner rail is securely attached to the node. Align the inner rail of the node to the intermediate rail in the rack. Slide the node forward into the rack.
- The rail has a lock mechanism that prevents the hardware from being fully pushed into the rack. Pull the blue tab forward to unlock the intermediate rail and continue sliding the node into the rack.
- Secure the captive screws onto the node ears.
- Angle in the right side of the bezel so that the upper and lower tabs on the right side engage with the corresponding holes on the chassis. Rotate the key counter-clockwise until it stops, which is past the "lock" icon in the 11 o'clock position.