Please enter search query.
Search <book_title>...
Veritas™ 5250 Appliance Hardware Installation Guide
Last Published:
2024-08-21
Product(s):
Appliances (Version Not Specified)
Platform: Veritas 5250
- Hardware overview
- Preinstallation requirements
- S Series Appliance installation procedures
- D Series Appliance installation procedures
- Next steps after installation
- Appendix A. Adding one or more storage shelves to an operating appliance that does not have any storage shelves
- Connecting the S Series storage shelves to the appliance
- Connecting the D Series storage shelves to the appliance
- Appendix B. Adding storage shelves to an operating appliance that has at least one storage shelf attached
- Recabling to connect additional S Series storage shelves
- Recabling to connect additional D Series storage shelves
- Appendix C. Configuring the disk space for new NetBackup Expansion Storage Shelves
- Appendix D. Configuring the disk space for new Flex Expansion Storage Shelves
Connecting four D Series storage shelves to an appliance
Note:
The cables in the illustrations in the following sections are shown in different colors for demonstration purposes only. The actual cables are black.
Note:
To connect four storage shelves to an appliance
- Connect a SAS-3 cable to the left port in the appliance RAID PCIe card.
- Connect the other end of the SAS-3 cable to port 1 in the top I/O module of the first storage shelf.
- Connect SAS-3 cables between the remaining four storage shelves.
- Connect a SAS-3 connector to port 1 in the bottom of the I/O module in the fourth shelf.
- Connect the other end of the cable to the right port in the appliance RAID PCIe card.
- Connect a SAS-3 cable to port 2 in the bottom I/O module of the fourth shelf. Connect the other end of the cable to port 1 in the bottom I/O module of the third shelf.
- Connect port 2 in the bottom I/O module of the third shelf to port 1 in the bottom I/O module in the second shelf.
- Connect port 2 in the bottom I/O module of the second shelf to port 1 in the bottom I/O module in the first shelf.
Next, connect network and power cables. Turn on the storage shelves and the appliance per the required sequence. Verify that all units function correctly.