Veritas NetBackup™ 5230 Appliance Hardware Installation Guide

Last Published:
Product(s): Appliances (Version Not Specified)
Platform: 5230
  1. Overview
    1.  
      Product overview
    2.  
      Appliance front panel
    3.  
      Appliance rear panel
    4.  
      PCIe riser assemblies and slots
    5.  
      3U16 storage shelf
    6.  
      2U12 storage shelf
    7.  
      Product documentation
  2. Preparing for hardware installation
    1.  
      Tools
    2.  
      Hardware installation flow
    3.  
      3U16 storage shelf weights and dimensions
    4.  
      Rack guidelines
    5.  
      Power supply overview
    6.  
      Electrical safety
    7.  
      Heat dissipation
    8.  
      Checking the shipping packages
    9.  
      Removing the protective film from the 3U16 storage shelf
    10.  
      Locating hardware serial numbers
    11.  
      Prerequisites for IPMI configuration on a 52xx and 5330
  3. Installing an appliance and 3U16 storage shelves into racks
    1.  
      Precautions - heavy equipment
    2.  
      Installing the 3U16 storage shelf guide rails
    3.  
      Installing the 3U16 storage shelf into a rack
    4.  
      Installing the appliance guide rails
    5.  
      Installing the appliance into a rack
  4. Cables
    1.  
      About the cables
    2.  
      Connecting the VGA cable
    3.  
      Connecting the network cables
    4.  
      Connecting the appliance to one or more 3U16 storage shelves
    5.  
      Connecting the small form-factor pluggable (SFP+) transceivers
    6.  
      Connecting the power cables
  5. Verifying hardware operation and configuring IPMI
    1.  
      Hardware verification
    2.  
      Turning on the storage shelves
    3.  
      Turning on the appliance
    4.  
      Configuring the IPMI port from the NetBackup Appliance Shell Menu
    5.  
      Accessing and using the Veritas Remote Management interface
  6. Appendix A. Adding 3U16 storage shelves to an operational NetBackup 5230 Appliance
    1.  
      About adding 3U16 storage shelves to an operational appliance
    2.  
      Shutting down the appliance
    3.  
      Preparing the appliance to install the additional hardware
    4.  
      Installing the additional memory
    5.  
      Installing the additional Maintenance-Free Backup Unit (MFBU)
    6.  
      Installing the external RAID controller card
    7.  
      Removing the protective film from the storage shelf
    8.  
      Installing 3U16 storage shelves into the rack
    9.  
      Connecting the 3U16 shelves to an appliance or to other 3U16 shelves
    10.  
      Connecting the 3U16 storage shelf and appliance power cords
    11.  
      Turning on the hardware and verifying operation
  7. Appendix B. Adding 2U12 storage shelves to an operational NetBackup 5230 Appliance
    1.  
      About adding 2U12 storage shelves to an operational appliance
    2.  
      Shutting down the appliance
    3.  
      Preparing the appliance to install the additional hardware
    4.  
      Installing the additional memory
    5.  
      Installing the additional Maintenance Free Backup Unit (MFBU)
    6.  
      Installing the external RAID controller card
    7.  
      Installing 2U12 storage shelves into the rack
    8.  
      Connecting the 2U12 shelves to an appliance or other storage shelves
    9.  
      Connecting the 2U12 storage shelf and appliance power cords
    10.  
      Turning on the hardware and verifying operation
  8. Appendix C. Adding new disk space to the appliance configuration
    1.  
      Adding the disk space of additional storage shelves from the NetBackup Appliance Web Console
    2.  
      Adding the disk space of additional storage shelves from the NetBackup Appliance Shell Menu

Hardware verification

Review the information in Table: Installation confirmation after the hardware installation and cable connections are complete, but before the devices are turned on.

Note:

Do not attach external devices, such as tape drives or SAN clients, to the appliance until this process has been completed.

Warning:

Confirm that all power to the devices is turned off to prevent personnel injuries and to prevent damage to the devices.

Verify that the devices and cables are installed correctly. The following table provides instructions to verify the device installation.

Table: Installation confirmation

Component

Correct installation

Incorrect installation

Storage shelves

The storage shelves are installed securely in the lowest portion of the rack cabinet.

The storage shelves are insecurely mounted or mounted too high within the rack cabinet.

Appliance

The appliance is installed securely in the rack cabinet, on top of any storage shelves.

The appliance is insecurely mounted or mounted too high within the rack cabinet.

AC power cables

The AC power cables of the appliance and all storage shelves are connected to the power modules and the AC power supply.

Only one power cable is connected to the device.