About the cables
The NetBackup appliances and storage devices use the following cables.
Cables shipped with the product:
Power Distribution Unit (PDU) cords for connecting the devices to main AC power source.
Most NetBackup appliances and storage shelves ship with two PDU compatible cords (C13-C14). Other power cables ship to limited, specified, countries.
SAS2 cables to connect the appliance to a 3U16 storage shelf and to connect 3U16 storage shelves to each other.
SAS2-to-SAS3 cables to connect the appliance to a 2U12 storage shelf.
SAS3 cables to connect 2U12 storage shelves to each other.
Cables which the customer must provide:
1-Gb/s network cables
10-Gb/s network cables
Fibre Channel cables for client and device connections
PS/2 to USB adapter cable
KVM cable