Please enter search query.
Search <book_title>...
Veritas NetBackup™ 5230 Appliance Hardware Installation Guide
Last Published:
2019-06-24
Product(s):
Appliances (Version Not Specified)
Platform: 5230
- Overview
- Preparing for hardware installation
- Installing an appliance and 3U16 storage shelves into racks
- Cables
- Verifying hardware operation and configuring IPMI
- Appendix A. Adding 3U16 storage shelves to an operational NetBackup 5230 Appliance
- Appendix B. Adding 2U12 storage shelves to an operational NetBackup 5230 Appliance
- Appendix C. Adding new disk space to the appliance configuration
Appliance rear panel
The appliance rear panel provides access to the communication ports, PCIe add-in cards, and the hot-swappable power supplies.
NetBackup 5230 appliances ship with grounding studs that are located on the rear panel of the appliance. You can use standard grounding practices to connect grounding wires to the studs.