Veritas NetBackup™ 5230 Appliance Hardware Installation Guide
Last Published:
2019-06-24
Product(s):
Appliances (Version Not Specified)
Platform: 5230
- Overview
- Preparing for hardware installation
- Installing an appliance and 3U16 storage shelves into racks
- Cables
- Verifying hardware operation and configuring IPMI
- Appendix A. Adding 3U16 storage shelves to an operational NetBackup 5230 Appliance
- Appendix B. Adding 2U12 storage shelves to an operational NetBackup 5230 Appliance
- Appendix C. Adding new disk space to the appliance configuration
Connecting the 2U12 storage shelf and appliance power cords
Each appliance and each storage shelf contain two AC power supplies. To ensure power redundancy, connect the power supplies on each component to separate AC power sources.
Caution:
Do not turn on the power to any components while connecting the power cords. The components must be turned on in a specific sequence to ensure correct communication.
To connect the power cables
- Verify that the AC power supply input for the appliance and for the storage shelf is within one of these ranges.
100 - 127 VAC at 50/60 Hz
200 - 240 VAC at 50/60 Hz
- For each shelf, obtain two power cords that are appropriate for your region and equipment.
- Locate the power sockets in the shelf.
- Connect one cable between each socket and a socket on the Power Distribution Unit (PDU) for your rack.
Note:
The following steps apply if you removed the appliance from the rack to install additional components.
- Obtain two power cords for your appliance.
- Locate the power sockets in the appliance.
- Connect one cable between each socket and a socket on the Power Distribution Unit (PDU) for your rack.