Please enter search query.
Search <book_title>...
Veritas NetBackup™ 5230 Appliance Hardware Installation Guide
Last Published:
2019-06-24
Product(s):
Appliances (Version Not Specified)
Platform: 5230
- Overview
- Preparing for hardware installation
- Installing an appliance and 3U16 storage shelves into racks
- Cables
- Verifying hardware operation and configuring IPMI
- Appendix A. Adding 3U16 storage shelves to an operational NetBackup 5230 Appliance
- Appendix B. Adding 2U12 storage shelves to an operational NetBackup 5230 Appliance
- Appendix C. Adding new disk space to the appliance configuration
Connecting the power cables
Caution:
The equipment should be completely installed and all network cables should be connected before any devices are connected to power sources.
The rear panel of the appliance has two power modules. Each module requires a separate AC power cable or PDU cord. Connect one end of the cable or cord to a power module. Then, plug the other end into a 110 VAC or a 220-VAC socket.
The rear panel of the 3U16 storage shelf also has two power modules. Each module requires a separate AC power cable or PDU cord. Connect each module to a 110-VAC or a 220-VAC socket.