Please enter search query.
Search <book_title>...
Veritas Access 3360 Appliance Hardware Installation Guide
Last Published:
2025-03-27
Product(s):
Appliances (8.4, 8.3, 8.2)
Platform: Veritas 3360
- Overview
- About the compute node control panel
- Pre-installation requirements
- Hardware installation procedures
- Appendix A. Adding Expansion Storage Shelves to an operating appliance that does not have any Expansion shelves
- Appendix B. Adding Expansion Storage Shelves to an operating appliance that has at least one operating Expansion shelf
- Appendix C. Configuring the disk space after adding one or more new Expansion Storage Shelves
Connecting the power cords to the hardware
Typically, the rear of a rack is configured with a Power Distribution Unit (PDU) on each side. The PDU on each side is from a different source to provide power redundancy.
Caution:
Do not turn on the power to any components while connecting the power cords. The components must be turned on in a specific sequence to ensure correct communication.
Refer to the following section for a description of the power cable connectors.
To connect the power cables
- For each component, obtain two power cords that are appropriate for your region and equipment.
- On the compute node, connect a power cord to each power supply socket. Connect the other end of each cord to a different PDU.
- On each storage shelf, connect a power cord to each power supply socket. Connect the other end of each cord to a different PDU socket.
- Verify that your power cable connections match the connections in the following diagram.