Veritas™ 5360 Appliance Hardware Installation Guide

Last Published:
Product(s): Appliances (Version Not Specified)
Platform: Veritas 5360
  1. Hardware overview
    1.  
      About the appliance and the storage shelves
    2.  
      Compute node drives
    3. About the 5360 Appliance control panel
      1.  
        About the System Status LED states
      2.  
        About the Power button LED states
      3.  
        About the integrated BMC beep codes
    4.  
      Compute node rear panel
    5.  
      5U84 storage shelf drawers and disk drives
    6.  
      5U84 storage shelf control panel
    7.  
      5U84 storage shelf rear panel
    8.  
      5U84 storage shelf RAID controller
    9.  
      5U84 storage shelf Expansion module
    10.  
      Cables and connectors
    11.  
      About IPMI configuration
  2. Preinstallation requirements
    1.  
      Customer-provided environment and supplies
    2.  
      Appliance shipping container contents
    3.  
      Storage shelf shipping container contents
    4.  
      Dimensions and determining rack locations
    5.  
      Best practices for rack installation
    6.  
      Storage shelf rack requirements
    7.  
      Heat dissipation
    8.  
      Cable length verification
    9.  
      Prerequisites for IPMI configuration
  3. Hardware installation procedures
    1.  
      Overview
    2.  
      Installing a storage shelf
    3.  
      Installing disk drives into a full-capacity storage shelf
    4.  
      Installing disk drives and blanks into a half-capacity storage shelf
    5.  
      Installing disk drives into a half-capacity storage shelf
    6.  
      Installing the compute node rack rails
    7.  
      Installing the compute node into a rack
    8.  
      Connecting the hardware to one compute node
    9.  
      Connecting the hardware to two compute nodes
    10.  
      Connecting Flex nodes to the network
    11.  
      Connecting the power cords
    12.  
      Turning on the hardware and verifying operation
    13.  
      Configuring the Veritas Remote Management Interface from a Flex Appliance
    14.  
      Configuring the Veritas Remote Management Interface using laptop
    15.  
      Accessing and using the Veritas Remote Management interface
  4. Appendix A. Adding Expansion Storage Shelves to an operating appliance that does not have any Expansion shelves
    1.  
      Overview
    2.  
      Turning off the existing hardware
    3.  
      Installation instructions
    4.  
      Connecting one Expansion Shelf to the Primary Shelf
    5.  
      Connecting two Expansion Shelves to the Primary Shelf
    6.  
      Connecting three Expansion Shelves to the Primary Shelf
  5. Appendix B. Adding Expansion Storage Shelves to an operating appliance that has at least one operating Expansion shelf
    1.  
      Overview
    2.  
      Turning off the existing hardware
    3.  
      Installation instructions
    4.  
      Connecting one Expansion Shelf to a system that has one existing Expansion Shelf
    5.  
      Connecting two Expansion Shelves to a system that has one existing Expansion Shelf
    6.  
      Connecting one Expansion Shelf to a system that has two existing Expansion Shelves
  6. Appendix C. Configuring the disk space for new Flex Expansion Storage Shelves
    1.  
      Adding the disk space of an Expansion Storage Shelf from the Flex Appliance Console

Turning off the existing hardware

You must turn off the existing system before you turn on any new Expansion shelves. Be sure to perform these steps in the order that they are presented.

To turn off the existing hardware

  1. Perform a soft shutdown of the compute nodes.

    If you have two compute nodes you must shut them down separately.

    • From the Flex Appliance Shell, enter system shutdown.

    • Verify that the compute node is completely turned off. All LEDs are off. Fans are not running.

    • Repeat these steps for a second compute node if applicable.

  2. After the compute nodes are turned off you must manually turn off the storage shelves.
    • Turn off the Primary shelf first.

    • Then turn off the Expansion shelf.

    • If you have a second Expansion shelf turn it off last.

  3. Locate the on/off switches on the two power supplies on the rear of the storage shelves. The switches are in the same location for the Primary shelf and for the Expansion shelves.
  4. Press the switches on the Primary shelf to off.
  5. Press the switches on the Expansion shelf that is closest to the Primary shelf to off.
  6. If you have a second Expansion shelf press the switches to off.