Veritas™ 5360 Appliance Hardware Installation Guide

Last Published:
Product(s): Appliances (Version Not Specified)
Platform: Veritas 5360
  1. Hardware overview
    1.  
      About the appliance and the storage shelves
    2.  
      Compute node drives
    3. About the 5360 Appliance control panel
      1.  
        About the System Status LED states
      2.  
        About the Power button LED states
      3.  
        About the integrated BMC beep codes
    4.  
      Compute node rear panel
    5.  
      5U84 storage shelf drawers and disk drives
    6.  
      5U84 storage shelf control panel
    7.  
      5U84 storage shelf rear panel
    8.  
      5U84 storage shelf RAID controller
    9.  
      5U84 storage shelf Expansion module
    10.  
      Cables and connectors
    11.  
      About IPMI configuration
  2. Preinstallation requirements
    1.  
      Customer-provided environment and supplies
    2.  
      Appliance shipping container contents
    3.  
      Storage shelf shipping container contents
    4.  
      Dimensions and determining rack locations
    5.  
      Best practices for rack installation
    6.  
      Storage shelf rack requirements
    7.  
      Heat dissipation
    8.  
      Cable length verification
    9.  
      Prerequisites for IPMI configuration
  3. Hardware installation procedures
    1.  
      Overview
    2.  
      Installing a storage shelf
    3.  
      Installing disk drives into a full-capacity storage shelf
    4.  
      Installing disk drives and blanks into a half-capacity storage shelf
    5.  
      Installing disk drives into a half-capacity storage shelf
    6.  
      Installing the compute node rack rails
    7.  
      Installing the compute node into a rack
    8.  
      Connecting the hardware to one compute node
    9.  
      Connecting the hardware to two compute nodes
    10.  
      Connecting Flex nodes to the network
    11.  
      Connecting the power cords
    12.  
      Turning on the hardware and verifying operation
    13.  
      Configuring the Veritas Remote Management Interface from a Flex Appliance
    14.  
      Configuring the Veritas Remote Management Interface using laptop
    15.  
      Accessing and using the Veritas Remote Management interface
  4. Appendix A. Adding Expansion Storage Shelves to an operating appliance that does not have any Expansion shelves
    1.  
      Overview
    2.  
      Turning off the existing hardware
    3.  
      Installation instructions
    4.  
      Connecting one Expansion Shelf to the Primary Shelf
    5.  
      Connecting two Expansion Shelves to the Primary Shelf
    6.  
      Connecting three Expansion Shelves to the Primary Shelf
  5. Appendix B. Adding Expansion Storage Shelves to an operating appliance that has at least one operating Expansion shelf
    1.  
      Overview
    2.  
      Turning off the existing hardware
    3.  
      Installation instructions
    4.  
      Connecting one Expansion Shelf to a system that has one existing Expansion Shelf
    5.  
      Connecting two Expansion Shelves to a system that has one existing Expansion Shelf
    6.  
      Connecting one Expansion Shelf to a system that has two existing Expansion Shelves
  6. Appendix C. Configuring the disk space for new Flex Expansion Storage Shelves
    1.  
      Adding the disk space of an Expansion Storage Shelf from the Flex Appliance Console

Installing the compute node into a rack

After the appliance rails have been installed, you can install the appliance into the rack.

After the storage shelves and the compute node rails have been installed, you can install the compute node into the rack. These instructions apply to a one-node system and to a multi-node system.

  1. Verify that the rails are securely attached.
    • Verify that the outer rail is securely attached to the rack.

    • Verify that the inner rail is securely attached to the compute node.

  2. Place the hardware in the front of the rack.
  3. Slide the blue tab forward to unlock the intermediate rail.
  4. Pull the intermediate portion of rail the rail forward. Ensure that the ball bearing retainer on the intermediate rail is locked forward.

    Note:

    You do not need to extend the rails as far as they can possibly extend. You only need sufficient space to place the hardware into the rails.

  5. Align the compute node inner rail to the intermediate rail in the rack. Slide the inner rail that is attached to compute node forward into the intermediate rail until a hard stop is encountered.

    The rail has a lock mechanism that prevents the hardware from being fully pushed into the rack.

  6. Slide the blue tab to unlock the rails and continue the sliding of the compute node into the rack.
  7. Secure the captive screws on the compute node ears.