Please enter search query.
Search <book_title>...
Veritas NetBackup™ Flex Scale Administrator's Guide
Last Published:
2025-02-12
Product(s):
Appliances (3.2)
Platform: NetBackup Flex Scale OS
- Product overview
- Viewing information about the NetBackup Flex Scale cluster environment
- NetBackup Flex Scale infrastructure management
- User management
- About Universal Shares
- Node and disk management
- Adding a node to the cluster using the NetBackup Flex Scale web interface
- License management
- Managing the Fibre Channel ports
- Requirements
- Managing hardware vendor packages
- User management
- NetBackup Flex Scale network management
- Bonding operations
- Data network configurations
- Network configuration on plain device (eth5)
- Network configuration on bonded interfaces (bond0 on eth5 and eth7)
- NetBackup Flex Scale infrastructure monitoring
- Resiliency in NetBackup Flex Scale
- EMS server configuration
- Site-based disaster recovery in NetBackup Flex Scale
- Performing disaster recovery using RESTful APIs
- NetBackup Flex Scale security
- STIG overview for NetBackup Flex Scale
- FIPS overview for NetBackup Flex Scale
- Support for immutability in NetBackup Flex Scale
- Deploying external certificates on NetBackup Flex Scale
- Configuring multifactor authentication
- Single Sign-On (SSO)
- Appendix A. Maintenance procedures for HPE servers
- Appendix B. Configuring NetBackup optimized duplication
- Appendix C. Disaster recovery terminologies
- Appendix D. Configuring Auto Image Replication
Replacement procedure for memory (DIMMs)
This topic describes the process for replacing DIMMs that are faulty.
Identifying DIMM failure (performed by the CHS team)
Email alerts are generated for DIMM failures if SMTP is configured for AutoSupport. The alert includes the CPU and the slot the DIMM is missing or faulty.
The HPE Integrated Lights-Out (iLO) remote console shows the missing DIMM slots:
Replacing the DIMMs (performed by Veritas TSE)
To replace the DIMMs, complete the following steps:
- Sign in to the NetBackup Flex Scale infrastructure management UI and navigate to Monitor > Infrastructure > Nodes.
- On the node where the failure occurred, click the Actions menu (vertical ellipsis) from the right side of the row in the UI and click Shutdown node.
- Confirm that the node is shut down successfully. In the UI, you can view the notification at the top of the page.
- Replace the DIMM.
Completing the post-replacement tasks (performed by Veritas TSE)
After the hardware component is replaced, verify that the issue is resolved.
To verify that the issue is resolved, complete the following steps:
- Power on the server and wait till the node joins the cluster.
- Check the node state. Navigate to Monitor > Infrastructure > Nodes.
- Click Dashboard and check the status of the services.
- Verify that the replaced DIMMs show Good, in use status in the iLO remote console.