Please enter search query.
Search <book_title>...
Storage Foundation and High Availability Solutions 7.4 HA and DR Solutions Guide for Microsoft Exchange 2010 - Windows
Last Published:
2018-05-31
Product(s):
InfoScale & Storage Foundation (7.4)
Platform: Windows
- Section I. Introduction and Concepts
- Introducing Storage Foundation and High Availability Solutions for Microsoft Exchange Server
- How VCS monitors storage components
- Introducing the VCS agent for Exchange 2010
- Introducing Storage Foundation and High Availability Solutions for Microsoft Exchange Server
- Section II. Configuration Workflows
- Configuring high availability for Exchange Server with InfoScale Enterprise
- Reviewing the HA configuration
- Reviewing a standalone Exchange Server configuration
- Reviewing the Replicated Data Cluster configuration
- Reviewing the disaster recovery configuration
- Disaster recovery configuration
- Notes and recommendations for cluster and application configuration
- Configuring disk groups and volumes for Exchange Server
- About managing disk groups and volumes
- Configuring the cluster using the Cluster Configuration Wizard
- Using the Solutions Configuration Center
- Configuring high availability for Exchange Server with InfoScale Enterprise
- Section III. Deployment
- Installing Exchange Server 2010
- Configuring Exchange Server for failover
- Configuring the service group in a non-shared storage environment
- Configuring campus clusters for Exchange Server
- Configuring Replicated Data Clusters for Exchange Server
- Setting up the Replicated Data Sets (RDS)
- Configuring a RVG service group for replication
- Configuring the resources in the RVG service group for RDC replication
- Configuring the RVG Primary resources
- Adding the nodes from the secondary zone to the RDC
- Verifying the RDC configuration
- Deploying disaster recovery for Exchange Server
- Reviewing the disaster recovery configuration
- Setting up your replication environment
- Configuring replication and global clustering
- Configuring the global cluster option for wide-area failover
- Possible task after creating the DR environment: Adding a new failover node to a Volume Replicator environment
- Testing fault readiness by running a fire drill
- About the Fire Drill Wizard
- About post-fire drill scripts
- Prerequisites for a fire drill
- Preparing the fire drill configuration
- Running a fire drill
- Deleting the fire drill configuration
- Section IV. Reference
- Appendix A. Using Veritas AppProtect for vSphere
- Appendix B. Troubleshooting
- Appendix A. Using Veritas AppProtect for vSphere
Preparing the existing DR environment
If you plan to add a failover node to the secondary site, you must temporarily switch the roles of the primary and secondary sites so that the current site becomes the primary. This action reverses the direction of replication.
To prepare the existing DR environment
- If you adding the failover node to the cluster at the primary site, proceed directly to step 2. If you are adding a failover node to the secondary site, you must switch the roles of the primary and secondary sites. This action reverses the direction of replication.
In the Service Groups tab of the Cluster Explorer configuration tree, right-click the service group that is online at the current primary site.
Click Switch To, and click Remote switch.
In the Switch global group dialog box:
Click the cluster at the secondary site you want to switch the group to.
Click the specific system where you want to bring the global Exchange service group online.
Click OK.
- Take the global Exchange service group offline at the current primary site.
- Take the Volume Replicator replication service group offline.