Storage Foundation and High Availability Solutions 7.4 HA and DR Solutions Guide for Microsoft Exchange 2010 - Windows
- Section I. Introduction and Concepts
- Introducing Storage Foundation and High Availability Solutions for Microsoft Exchange Server
- How VCS monitors storage components
- Introducing the VCS agent for Exchange 2010
- Introducing Storage Foundation and High Availability Solutions for Microsoft Exchange Server
- Section II. Configuration Workflows
- Configuring high availability for Exchange Server with InfoScale Enterprise
- Reviewing the HA configuration
- Reviewing a standalone Exchange Server configuration
- Reviewing the Replicated Data Cluster configuration
- Reviewing the disaster recovery configuration
- Disaster recovery configuration
- Notes and recommendations for cluster and application configuration
- Configuring disk groups and volumes for Exchange Server
- About managing disk groups and volumes
- Configuring the cluster using the Cluster Configuration Wizard
- Using the Solutions Configuration Center
- Configuring high availability for Exchange Server with InfoScale Enterprise
- Section III. Deployment
- Installing Exchange Server 2010
- Configuring Exchange Server for failover
- Configuring the service group in a non-shared storage environment
- Configuring campus clusters for Exchange Server
- Configuring Replicated Data Clusters for Exchange Server
- Setting up the Replicated Data Sets (RDS)
- Configuring a RVG service group for replication
- Configuring the resources in the RVG service group for RDC replication
- Configuring the RVG Primary resources
- Adding the nodes from the secondary zone to the RDC
- Verifying the RDC configuration
- Deploying disaster recovery for Exchange Server
- Reviewing the disaster recovery configuration
- Setting up your replication environment
- Configuring replication and global clustering
- Configuring the global cluster option for wide-area failover
- Possible task after creating the DR environment: Adding a new failover node to a Volume Replicator environment
- Testing fault readiness by running a fire drill
- About the Fire Drill Wizard
- About post-fire drill scripts
- Prerequisites for a fire drill
- Preparing the fire drill configuration
- Running a fire drill
- Deleting the fire drill configuration
- Section IV. Reference
- Appendix A. Using Veritas AppProtect for vSphere
- Appendix B. Troubleshooting
- Appendix A. Using Veritas AppProtect for vSphere
Tasks for configuring campus clusters
In campus clusters you begin by configuring a high availability cluster and then continue with the steps specific to the campus cluster configuration.
Refer to the campus cluster configuration workflow table for a complete list of configuration steps.
See VCS campus cluster configuration.
The following table shows the steps specific to the campus cluster configuration that are done after configuring high availability on the nodes.
Table: Completing campus cluster configuration
Action | Description |
---|---|
Verify the campus cluster configuration | Verify that failover occurs between the nodes. See Verifying the campus cluster: Switching the service group. |
Set the ForceImport attribute | In case of a site failure, you may have to set the ForceImport attribute to ensure proper failover. See Setting the ForceImport attribute to 1 after a site failure. |