Please enter search query.
Search <book_title>...
Veritas InfoScale 7.3.1 Release Notes - Windows
Last Published:
2017-12-15
Product(s):
InfoScale & Storage Foundation (7.3.1)
- Release notes for Veritas InfoScale
- Limitations
- Deployment limitations
- Cluster management limitations
- Storage management limitations
- Multi-pathing limitations
- Replication limitations
- Solution configuration limitations
- Internationalization and localization limitations
- Interoperability limitations
- Known issues
- Deployment issues
- Cluster management issues
- Cluster Server (VCS) issues
- Cluster Manager (Java Console) issues
- Global service group issues
- VMware virtual environment-related issues
- Cluster Server (VCS) issues
- Storage management issues
- Storage Foundation
- VEA console issues
- Snapshot and restore issues
- Snapshot scheduling issues
- Storage Foundation
- Multi-pathing issues
- Replication issues
- Solution configuration issues
- Disaster recovery (DR) configuration issues
- Fire drill (FD) configuration issues
- Quick recovery (QR) configuration issues
- Internationalization and localization issues
- Interoperability issues
- Miscellaneous issues
- Fibre Channel adapter issues
- Deployment issues
After a failover occurs, a snapshot operation scheduled within two minutes of the failover does not occur
When a failover occurs and the disk group is imported on the active node, the scheduler waits for two minutes. Then the schedule-related information is refreshed. If a snapshot operation, such as a mirror preparation or a snapshot, is scheduled within those two minutes, it does not occur at that time. The schedule starts working with the next scheduled snapshot operation. If the mirror preparation operation was skipped, it is performed at the time of the next scheduled snapshot. (798628)