Please enter search query.
Search <book_title>...
Veritas Access 7.3 Release Notes
Last Published:
2019-04-04
Product(s):
Access (7.3)
Platform: Linux
- Overview of Veritas Access
- Changes in this release
- Technical preview features
- Fixed issues
- Software limitations
- Flexible Storage Sharing limitations
- Limitations related to installation and upgrade
- Veritas Access language support
- File system limitation
- Known issues
- Veritas Access known issues
- AWS issues
- Backup issues
- CIFS issues
- Deduplication issues
- Enterprise Vault Attach known issues
- FTP issues
- GUI issues
- Installation and configuration issues
- Networking issues
- NFS issues
- ObjectAccess issues
- OpenDedup issues
- OpenStack issues
- Replication issues
- SmartIO issues
- Storage issues
- Veritas Access known issues
- Getting help
Configuring Veritas Access with the installer fails when the SSH connection is lost (3794964)
When you install and configure Veritas Access with the installer, you may see the following error message:
CPI ERROR V-9-20-1073 Failed to copy /opt/VRTSsnas/conf/conf.tar
This message occurs in the rare case when the installer cannot copy the configuration file to the nodes in the cluster because the SSH connection is lost.
Workaround:
To work around this issue:
- Recover the SSH connection manually.
- Uninstall Veritas Access.
- Reinstall Veritas Access.