InfoScale™ 9.0 Storage Foundation Quick Recovery Solutions Guide for Microsoft SQL Server - Windows
- Introducing Quick Recovery for SQL Server
- Methods of implementing Quick Recovery snapshots for SQL Server
- About the components used in Quick Recovery
- Preparing to implement Quick Recovery for SQL Server
- Implementing Quick Recovery for SQL Server with the configuration wizard
- About the Quick Recovery Configuration Wizard
- Scheduling SQL Server snapshot sets
- Scheduling or creating an individual snapshot set for SQL Server
- Maintaining or troubleshooting snapshots
- Recovering a SQL Server database
- Recovering missing volumes
- Vxsnap utility command line reference for SQL Server
Snapshot Schedule panel details
Use the Quick Recovery wizard Snapshot Schedule panel to configure one or more snapshot schedules for each snapshot set. You can edit schedules, add schedules, or remove schedules.
To specify a simple schedule, edit the default schedule settings as follows:
The time to start the snapshot (at least 1 hour later than the scheduled mirror preparation time)
The number of snapshots to take
The interval in minutes between snapshots
The type of snapshot
By default, the simple schedule takes effect on the current date and does not recur.
To specify a recurring schedule, a time window, a different run date, or other schedule details, click Edit to display the Edit Snapshot Schedule dialog box.
See Specifying snapshot schedule details.
Expired schedules cannot be edited. Instead, delete the expired schedule and add a new one.
After you have specified a schedule for a snapshot set, choose from the following:
Edit schedules for any remaining snapshot sets
Click
if you want to add a new scheduleClick
if you want to remove a schedule