Storage Foundation and High Availability Solutions 7.4.1 HA and DR Solutions Guide for Microsoft Exchange 2010 - Windows
- Section I. Introduction and Concepts
- Introducing Storage Foundation and High Availability Solutions for Microsoft Exchange Server
- How VCS monitors storage components
- Introducing the VCS agent for Exchange 2010
- Introducing Storage Foundation and High Availability Solutions for Microsoft Exchange Server
- Section II. Configuration Workflows
- Configuring high availability for Exchange Server with InfoScale Enterprise
- Reviewing the HA configuration
- Reviewing a standalone Exchange Server configuration
- Reviewing the Replicated Data Cluster configuration
- Reviewing the disaster recovery configuration
- Disaster recovery configuration
- Notes and recommendations for cluster and application configuration
- Configuring disk groups and volumes for Exchange Server
- About managing disk groups and volumes
- Configuring the cluster using the Cluster Configuration Wizard
- Using the Solutions Configuration Center
- Configuring high availability for Exchange Server with InfoScale Enterprise
- Section III. Deployment
- Installing Exchange Server 2010
- Configuring Exchange Server for failover
- Configuring the service group in a non-shared storage environment
- Configuring campus clusters for Exchange Server
- Configuring Replicated Data Clusters for Exchange Server
- Setting up the Replicated Data Sets (RDS)
- Configuring a RVG service group for replication
- Configuring the resources in the RVG service group for RDC replication
- Configuring the RVG Primary resources
- Adding the nodes from the secondary zone to the RDC
- Verifying the RDC configuration
- Deploying disaster recovery for Exchange Server
- Reviewing the disaster recovery configuration
- Setting up your replication environment
- Configuring replication and global clustering
- Configuring the global cluster option for wide-area failover
- Possible task after creating the DR environment: Adding a new failover node to a Volume Replicator environment
- Testing fault readiness by running a fire drill
- About the Fire Drill Wizard
- About post-fire drill scripts
- Prerequisites for a fire drill
- Preparing the fire drill configuration
- Running a fire drill
- Deleting the fire drill configuration
- Section IV. Reference
- Appendix A. Using Veritas AppProtect for vSphere
- Appendix B. Troubleshooting
- Appendix A. Using Veritas AppProtect for vSphere
DR configuration tasks: Primary site
The following table outlines the high-level objectives and the tasks to complete each objective for a DR configuration at the primary site.
Table: Configuring the primary site for disaster recovery
Action | Description |
---|---|
Understand the configuration | Understand the DR configuration |
Configure the storage hardware and network | For all nodes in the cluster:
|
Review pre-requisites and install InfoScale Enterprise |
|
Review application-specific requirements | See Notes and recommendations for cluster and application configuration. |
Configure the VCS cluster |
See Configuring the cluster using the Cluster Configuration Wizard. |
Configure disk groups and volumes for the Exchange Server |
See Configuring disk groups and volumes for Exchange Server. |
Install and configure Exchange Server |
|
Create Exchange databases on shared storage |
|
Create an Exchange service group |
|
Verify the primary site configuration | Test failover between nodes on the primary site |