InfoScale™ 9.0 Storage Foundation and High Availability Solutions Solutions Guide - Windows
- Section I. Introduction
- Introducing Storage Foundation and High Availability Solutions
- Using the Solutions Configuration Center
- SFW best practices for storage
- Section II. Quick Recovery
- Section III. High Availability
- High availability: Overview
- How VCS monitors storage components
- Deploying InfoScale Enterprise for high availability: New installation
- Notes and recommendations for cluster and application configuration
- Configuring disk groups and volumes
- Configuring the cluster using the Cluster Configuration Wizard
- About modifying the cluster configuration
- About installing and configuring the application or server role
- Configuring the service group
- About configuring file shares
- About configuring IIS sites
- About configuring applications using the Application Configuration Wizard
- About configuring the Oracle service group using the wizard
- Modifying the application service groups
- Adding DMP to a clustering configuration
- High availability: Overview
- Section IV. Campus Clustering
- Introduction to campus clustering
- Deploying InfoScale Enterprise for campus cluster
- Notes and recommendations for cluster and application configuration
- Reviewing the configuration
- Configuring the cluster using the Cluster Configuration Wizard
- Creating disk groups and volumes
- Installing the application on cluster nodes
- Section V. Replicated Data Clusters
- Introduction to Replicated Data Clusters
- Deploying Replicated Data Clusters: New application installation
- Notes and recommendations for cluster and application configuration
- Configuring the cluster using the Cluster Configuration Wizard
- Configuring disk groups and volumes
- Installing and configuring the application or server role
- Configuring the service group
- About configuring file shares
- About configuring IIS sites
- About configuring applications using the Application Configuration Wizard
- Configuring a RVG service group for replication
- Configuring the resources in the RVG service group for RDC replication
- Configuring the VMDg or VMNSDg resources for the disk groups
- Configuring the RVG Primary resources
- Adding the nodes from the secondary zone to the RDC
- Verifying the RDC configuration
- Section VI. Disaster Recovery
- Disaster recovery: Overview
- Deploying disaster recovery: New application installation
- Notes and recommendations for cluster and application configuration
- Reviewing the configuration
- About managing disk groups and volumes
- Setting up the secondary site: Configuring SFW HA and setting up a cluster
- Setting up your replication environment
- About configuring disaster recovery with the DR wizard
- Installing and configuring the application or server role (secondary site)
- Configuring replication and global clustering
- Configuring the global cluster option for wide-area failover
- Possible task after creating the DR environment: Adding a new failover node to a Volume Replicator environment
- Maintaining: Normal operations and recovery procedures (Volume Replicator environment)
- Testing fault readiness by running a fire drill
- About the Fire Drill Wizard
- Prerequisites for a fire drill
- Preparing the fire drill configuration
- Deleting the fire drill configuration
- Section VII. Microsoft Clustering Solutions
- Microsoft clustering solutions overview
- Deploying SFW with Microsoft failover clustering
- Tasks for installing InfoScale Foundation or InfoScale Storage for Microsoft failover clustering
- Creating SFW disk groups and volumes
- Implementing a dynamic quorum resource
- Deploying SFW with Microsoft failover clustering in a campus cluster
- Reviewing the configuration
- Establishing a Microsoft failover cluster
- Tasks for installing InfoScale Foundation or InfoScale Storage for Microsoft failover clustering
- Creating disk groups and volumes
- Implementing a dynamic quorum resource
- Installing the application on the cluster nodes
- Deploying SFW and VVR with Microsoft failover clustering
- Part 1: Setting up the cluster on the primary site
- Reviewing the prerequisites and the configuration
- Part 2: Setting up the cluster on the secondary site
- Part 3: Adding the Volume Replicator components for replication
- Part 4: Maintaining normal operations and recovery procedures
- Section VIII. Server Consolidation
- Server consolidation overview
- Server consolidation configurations
- Typical server consolidation configuration
- Server consolidation configuration 1 - many to one
- Server consolidation configuration 2 - many to two: Adding clustering and DMP
- About this configuration
- SFW features that support server consolidation
Overview of the server consolidation process
The server consolidation process involves more than just implementing the consolidation itself. It requires advance planning and approval of upper management. Here are some high-level steps:
Preliminary analysis: Determine what servers need to be consolidated. Take into account the applications being used and the departments involved. Research the hardware and software needs and costs.
Design a plan for the consolidation and secure approval and budget from upper management.
The primary justifications in the plan are cost savings and the need to remain competitive in today's business environment. The plan should also address IT management of the servers after the consolidation takes place.
Communicate with users about the proposed plan and identify the advantages of the plan before implementing the consolidation. Involve users in the planning process.
Do a proof of concept for the consolidation. Prototype the consolidation with a smaller number of servers that are not in production to see if your plan works.
In the next section, two sample configurations are provided for demonstrating a proof of concept for consolidation.
Implement the consolidation on actual production servers.
Purchase, install, and configure the new hardware and software for the migration.
Migrate the data.
Test to see that everything is working properly.
Put into effect new IT management processes for the consolidated servers.
In the months following the consolidation, implement a procedure to evaluate its effectiveness and the effectiveness of the IT management processes for the consolidated servers.