NetBackup™ for Cassandra Administrator's Guide

Last Published:
Product(s): NetBackup & Alta Data Protection (10.0)

Errors while backing up the jobs

Stale processes on backup jobs:

In some cases, canceling the child job for a Cassandra backup operation may keep some stale processes running on the CBR node and backup hosts. These needs to be killed manually before the next job is triggered.

The following are the processes on:

  • Backup host: bpbkarv

  • CBR node: nbcbr backup start

To kill these processes:

  • Step to identify PID: ps -ef | grep <bpbkarv>

  • ps -ef | grep <nbcbr backup start>.

  • To kill the identified -9 <pid_obtained_from_the_above_commands>.