Veritas InfoScale™ 7.3.1 Virtualization Guide - Solaris
- Section I. Overview of Veritas InfoScale Solutions used in Solaris virtualization
- Section II. Zones and Projects
- Storage Foundation and High Availability Solutions support for Solaris Zones
- About VCS support for zones
- About the Mount agent
- Configuring VCS in zones
- Prerequisites for configuring VCS in zones
- Deciding on the zone root location
- Configuring the service group for the application
- Exporting VxVM volumes to a non-global zone
- About SF Oracle RAC support for Oracle RAC in a zone environment
- Known issues with supporting SF Oracle RAC in a zone environment
- Software limitations of Storage Foundation support of non-global zones
- Storage Foundation and High Availability Solutions support for Solaris Projects
- Storage Foundation and High Availability Solutions support for Solaris Zones
- Section III. Oracle VM Server for SPARC
- Storage Foundation and High Availability Solutions support for Oracle VM Server for SPARC
- Oracle VM Server for SPARC deployment models
- Benefits of deploying Storage Foundation High Availability solutions in Oracle VM server for SPARC
- Features
- Split Storage Foundation stack model
- Guest-based Storage Foundation stack model
- Layered Storage Foundation stack model
- System requirements
- Installing Storage Foundation in a Oracle VM Server for SPARC environment
- Provisioning storage for a guest domain
- Software limitations
- Known issues
- Cluster Server support for using CVM with multiple nodes in a Oracle VM Server for SPARC environment
- VCS: Configuring Oracle VM Server for SPARC for high availability
- About VCS in a Oracle VM Server for SPARC environment
- About Cluster Server configuration models in an Oracle VM Server for SPARC environment
- Cluster Server setup to fail over a logical domain on a failure of logical domain
- Cluster Server setup to fail over an Application running inside logical domain on a failure of Application
- Oracle VM Server for SPARC guest domain migration in VCS environment
- Overview of a live migration
- About configuring VCS for Oracle VM Server for SPARC with multiple I/O domains
- Configuring VCS to manage a Logical Domain using services from multiple I/O domains
- Configuring storage services
- Configure a service group to monitor services from multiple I/O domains
- Configure the AlternateIO resource
- Configure the service group for a Logical Domain
- SF Oracle RAC support for Oracle VM Server for SPARC environments
- Support for live migration in FSS environments
- Storage Foundation and High Availability Solutions support for Oracle VM Server for SPARC
- Section IV. Reference
Overview of a warm migration
The Logical Domains Manager on the source system accepts the request to migrate a domain and establishes a secure network connection with the Logical Domains Manager running on the target system. Once this connection has been established, the migration occurs.
The migration operation occurs in the following phases:
Phase 1 | After connecting with the Logical Domains Manager running in the target host, information about the source system and domain are transferred to the target host. The Logical Domains Manager on the target host uses this information to perform a series of checks to determine whether a migration is possible. The checks differ depending on the state of the source domain. For example, if the source domain is active the Logical Domains Manger performs a different set of checks than if the domain is bound or inactive. |
Phase 2 | When all checks in Phase 1 have passed, the source and target systems prepare for the migration. The Logical Domains Manager on the source suspends and the source domain. On the target system, the Logical Domains Manager creates a domain to receive the source domain. |
Phase 3 | For an active domain, the next phase is to transfer all the runtime state information for the domain to the target. The Logical Domains Manager retrieves this information from the hypervisor. On the target, the Logical Domains Manager installs the state information in the hypervisor. |
Phase 4 | Handoff - after all state information is transferred, the handoff occurs when the target domain resumes execution (if the source was active). The Logical Domain Manager on the source destroys the source domain. From this point on, the target domain is the sole version of the domain running. |