Please enter search query.
Search <book_title>...
InfoScale™ 9.0 Cluster Server Agent for EMC SRDF Configuration Guide - Windows
Last Published:
2025-04-13
Product(s):
InfoScale & Storage Foundation (9.0)
Platform: Windows
- Introducing the agent for EMC SRDF
- Configuring the agent for EMC SRDF
- Testing VCS disaster recovery support with EMC SRDF
- How VCS recovers from various disasters in an HA/DR setup with EMC SRDF
- Setting up fire drill
Verifying a successful fire drill
Run the fire drill routine periodically to verify that the application service group can fail over to the remote node.
To verify a successful fire drill
- Bring the fire drill service group online on a node at the secondary site where the application is not running.
If the fire drill service group comes online, it validates your DR configuration. The service group at the primary site can fail over to the secondary site in the event of an actual failure or a disaster at the primary site.
- If the fire drill service group does not come online, review the VCS engine log for more information.
- Take the fire drill service group offline after its functioning has been verified.
Failing to take this service group offline may cause failures in your environment. For example, if the application service group fails over to the node where the fire drill service group is hosted, both the service groups may fault owing to resource conflicts.