Please enter search query.
Search <book_title>...
Veritas NetBackup™ 5240 Appliance Hardware Installation Guide
Last Published:
2020-05-06
Product(s):
Appliances (Version Not Specified)
Platform: Veritas 5240
- Hardware overview
- Preinstallation requirements
- Installation procedures
- Appendix A. Adding one or more storage shelves to an operating appliance that does not have any storage shelves
- Appendix B. Adding storage shelves to an operating appliance that has at least one storage shelf attached
- Appendix C. Adding the disk space of additional storage shelves
Connecting additional shelves to an appliance that already has two operating shelves
To connect additional shelves to an appliance that already has two operating shelves
- Remove the connector from the port that is marked with a red X.
- Reconnect the cable to the port that is marked with a green circle.
- Connect the two new SAS-3 cables that ship with each storage shelf, as shown.
- Connect power cords between the new storage shelves and separate Power Distribution Units (PDUs) in the rack.
- Turn on the storage shelf that is farthest from the appliance. Let the shelf initialize for a few minutes.
- Turn on the other storage shelves, in sequence. Do not turn on all of the shelves at once.
- Verify that the new shelves function correctly.
Refer to the following section for details.